Skills › BMAD Method › bmad-agent-po › replan.md
replan.md
15 lines · skills/bmad-agent-po/references/replan.md at bd70c64
Most marks come from matching words in the file, so treat them as pointers.
1# Replanning
3Leave the remaining tickets true and nothing already built rewritten. No proposal file.
5{{ workflow.replan_before }}
71. **Name the change** briefly: what changed, its source and evidence. Read the ticket, its `.memlog.md`, breakdown, finished children, and any architecture or design it touches; ask only what the tree cannot tell you. Say whether what is required changed or only how it is delivered, and propose a way forward (adjust remaining entries, roll back built work, or cut scope) with the reason; the user decides. An in-progress ticket: ask whether its build stops; never edit its plan.
82. **What is required.** When the change alters what the ticket requires, run `spec.md` on it with the change as input: lines re-render with ids kept, naming entries whose `covers` cite a changed id. Otherwise say so and skip.
93. **Re-slice** each affected epic per Re-slicing in `slice.md`; an obsolete or new epic changes the initiative's breakdown per Initiative into epics there.
104. **Drop** what no longer belongs per Close, drop, move in `board.md`, and clear what waited on it.
115. **Record the reason** as a dated `Decision:` line in the Notes of each container touched, in step 1's words. If the architecture spine or design is invalidated, note it in the container's Notes and offer `bmad-architecture` or `bmad-ux`; never edit the companion.
13Then report what changed, was dropped, and is ready.
15{{ workflow.replan_after }}
Replanning
Leave the remaining tickets true and nothing already built rewritten. No proposal file.
{{ workflow.replan_before }}
- Name the change briefly: what changed, its source and evidence. Read the ticket, its
.memlog.md, breakdown, finished children, and any architecture or design it touches; ask only what the tree cannot tell you. Say whether what is required changed or only how it is delivered, and propose a way forward (adjust remaining entries, roll back built work, or cut scope) with the reason; the user decides. An in-progress ticket: ask whether its build stops; never edit its plan. - What is required. When the change alters what the ticket requires, run
spec.mdon it with the change as input: lines re-render with ids kept, naming entries whosecoverscite a changed id. Otherwise say so and skip. - Re-slice each affected epic per Re-slicing in
slice.md; an obsolete or new epic changes the initiative's breakdown per Initiative into epics there. - Drop what no longer belongs per Close, drop, move in
board.md, and clear what waited on it. - Record the reason as a dated
Decision:line in the Notes of each container touched, in step 1's words. If the architecture spine or design is invalidated, note it in the container's Notes and offerbmad-architectureorbmad-ux; never edit the companion.
Then report what changed, was dropped, and is ready.
{{ workflow.replan_after }}
Raw lines 1 to 15