brainstorm-sections.md
462 lines · skills/ce-brainstorm/references/brainstorm-sections.md at 3449230
Most marks come from matching words in the file, so treat them as pointers.
Brainstorm Sections
This reference describes what makes a great requirements-only unified plan artifact produced by ce-brainstorm. It does NOT prescribe how the doc looks on the page — rendering is handled by the format-specific references (markdown-rendering.md, html-rendering.md).
The outcome
A great brainstorm produces the first version of the same plan artifact that ce-plan later enriches. It enables three audiences to act:
- The planning agent (
ce-planor a human) produces an implementation plan without inventing user behavior, scope boundaries, or success criteria — the brainstorm answered those. - The reviewer sees the framing choices, distinguishes settled decisions from open ones, and catches scope gaps before planning.
- The future reader traces why the proposed thing matters, who it's for, and what success looks like.
A section is included only when it serves one of these audiences. Omit padding.
Raw lines 8 to 22Unified plan skeleton contract
New ce-brainstorm outputs live under <root>/plans/ and use the unified plan artifact contract:
- Path:
<root>/plans/YYYY-MM-DD-HHMM-<type>-<topic>-plan.<md|html>(local wall-clock write time; no daily sequence number). Reserve the path atomically; on collision, retry with the smallest available numeric suffix before the extension rather than overwriting. - **
artifact_contract: ce-unified-plan/v1**. - **
product_contract_source: ce-brainstorm**. - **
execution** only when the brainstorm has enough signal to classify the eventual execution domain. For software features, useexecution: code. For non-code deliverables, follow the universal-brainstorming route instead of pretending the artifact is executable code.
A requirements-only unified plan is kept light and standalone-readable. It includes:
## Goal Capsulewith objective, product authority, and open blockers. The objective is the goal a reader who has not read the rest of the plan can hold. Constraints that must remain true live on their owning R-IDs (the R-IDs that state them), not as extra objective clauses — user-checkable is not a license to pack them onto the objective. The objective is always the outcome — what is true for users or operators afterwards, phrased so it would still read as the goal under a different implementation. It sits outside the component being changed: if a reader who does not know that component's internals could not tell whether the objective was met, it is stated at the component's level and the real objective is whatever depended on it. When the seed supplies an approach ("move X to Y"), that is the Means (its own line) and the objective is the outcome it serves, taken from the dialogue or the project's stated problem rather than assumed. When the coherent-work gate (Phase 0.3's check that the request holds one plannable outcome) split a broader request, the objective names the current area and product authority says the surrounding areas are not active scope.## Product Contractcontaining the brainstorm sections below.
Do not emit a ## Goal Launch Block or ## Reader Index: the launch prompt is skill-emitted at handoff, not a doc section, and the contract carries no Reader Index — consumers wayfind by scanning headings. It also omits empty Planning Contract, Implementation Units, Verification Contract, and Definition of Done sections — empty placeholders make requirements-only docs look executable and waste downstream tokens. ce-plan adds those sections when it enriches the same file in place. The next step (planning) is conveyed by the Phase 4 handoff menu, not by a section in the doc.
Historical docs/brainstorms/*-requirements.* files remain valid legacy inputs. Do not migrate or rewrite them when creating new artifacts.
Decide whether a doc is warranted at all
A brainstorm ends in chat unless a file is earned. A file is earned when the dialogue produced structural decisions, scope boundaries, or acceptance criteria that downstream consumers (planner, reviewer, future reader) need recorded under stable IDs, or when the user asks for one. Decisions that flow naturally to downstream artifacts (ce-plan's prompt, the commit message, <root>/solutions/) do not warrant a file; phase-0.md 0.3 (Assess Scope) states the Lightweight case.
Stress test: a brainstorm about a tiny bug fix where the user asks "fix this with a null check or with upstream validation?" and the agent confirms "upstream validation, here's why" doesn't need a brainstorm doc. The decision flows to ce-plan (or directly to commit message, or to <root>/solutions/ if it's a pattern worth carrying) without a brainstorm artifact in the middle.
Conversely, a brainstorm about a multi-actor feature with contested scope and several behavioral conditions probably does need a doc — the planning agent needs the structured content the dialogue produced.
Raw lines 69 to 89Match depth to content
When a doc IS warranted, depth matches what the dialogue produced. A brainstorm with sparse content produces a sparse doc; one with rich content produces a rich doc. Don't add ceremony to make a slim brainstorm look substantial.
Raw lines 90 to 96Prose economy
Match-depth-to-content sizes which sections appear and how deep each goes. This sizes how the kept prose reads. A section can be material and still be written loosely — the failure mode is a material section padded into a wall of text where contradictions hide and a downstream agent loses the thread. Length that carries content is fine; wordiness around that length is not.
Write every kept section through the ce-noslop skill.
Hold every kept section to these:
- Lead with the decision or outcome. Put the conclusion first, then the reason, then background; keep one claim plus its support per paragraph. Don't bury the chosen scope, an open blocker, or a Key Decision beneath its rationale. This does not override section roles — Summary stays proposal-only, Problem Frame stays motivation-only and never restates the remedy.
- A Summary is a handful of sentences, not one sentence with five semicolons and four parentheticals. If a sentence needs a second parenthetical to stay true, split it.
- A requirement is one sentence of intent plus at most one qualifier. When a requirement would specify two outcomes ("either A or B, planning decides"), state the intent and send the fork to Outstanding Questions — don't write both arms in full inside the requirement.
Precision is not padding: keep IDs, dates, actor names, domain terms, conditionals, and exact thresholds verbatim; when a concrete anchor is knowable from the work already done, use it instead of a vague abstraction. Economy targets the connective tissue around precision, never the precision itself.
Resolve in place; don't stratify. When a later decision answers a parked question or supersedes earlier text, rewrite or remove the original entry — don't append a separate "resolutions" layer that leaves the superseded text standing, and don't keep superseded prose as strikethrough. Version control holds the history. Stacked question/resolution layers double what a reader must read and hide which text is live.
One owner per rule; cite, don't restate. A normative rule — a check, cap, threshold, or output contract — is stated in full at exactly one entry: the R-ID that carries it. Every other section that needs the rule cites that ID (Covers R4, Governs R5, R7, "per R6") and adds only what is local to that section. A restatement that links back to the ID is allowed — an AE restating behavior under a Covers R… marker, a Flow citing the Rs it sequences. Unlinked sibling restatement — the same rule written out again in a Key Decision, Flow, or Scope bullet with no ID link — is the defect: each copy drifts independently and the doc has no rule for which one wins.
Bind external authorities; don't summarize them. When a requirement or decision adopts an external document (a field guide, spec, standard), state the commitment, cite the path, and record only this work's deltas. A multi-sentence summary of the cited document restates a source that lives outside the doc.
Raw lines 97 to 149Ready for Planning Check
Run this against the written artifact before declaring it written or presenting the Phase 4 handoff:
- Complete — no placeholders,
TBDs, or half-written sections remain; every Outstanding Question is classified asResolve Before PlanningorDeferred to Planning. When the coherent-work gate split a broader request, thework-relationshipssection is present and carries the marker for the resolved output format:<!-- ce-section: work-relationships -->in Markdown ordata-ce-section="work-relationships"on its wrapping<section>in HTML. - Consistent — Goal Capsule, Requirements, Key Flows, Acceptance Examples, Scope Boundaries, and the
work-relationshipssection do not contradict one another. Could a reader find a contradiction in each section in one pass? Could a colleague who was not in the session say what this work is after the Objective alone? A sentence with more than one parenthetical or a requirement that specifies two outcomes, or a rule stated in full in more than one section, fails this check — split it, defer the fork, or replace the duplicate with a citation of the ID that carries the rule. - Focused — the Product Contract covers one coherent work unit. Surrounding work appears only as context, deferred work, or an explicit non-goal; it does not leak into active Requirements, Flows, or Acceptance Examples.
- Usable by planning —
ce-plancan decide how to build the current work without inventing product behavior, scope, actors, or success criteria.
Fix a failed check in place when the correction preserves settled intent, then rerun the failed checks. When a fix would choose or change product behavior or scope, ask one targeted question and update the artifact after the answer. If the user is unavailable, keep the artifact blocked rather than letting planning invent the answer. Do not emit this checklist into the Product Contract; the corrected artifact is the output.
Raw lines 150 to 181Product Contract hard floor
When a requirements-only unified plan is warranted, these are present inside ## Product Contract.
- Summary — what is being proposed, in 1-3 lines. Forward-looking. Orients the reader before they invest in detail.
- Requirements (with stable R-IDs) — what must be true about the proposed thing. For very sparse brainstorms (≤3 simple items where the bullets ARE the summary), plain bullets without IDs are acceptable; the trigger for R-IDs is whether downstream consumers will reference them. When requirements span distinct concerns (e.g., "Packaging" / "Migration and compatibility" / "Contributor workflow"), group them under bold inline headers within the Requirements section — group by capability or concern, not by the order requirements were discussed. The trigger is distinct concerns, not item count — even four requirements benefit if they cover three different topics. Skip grouping only when all requirements are genuinely about the same thing; a long flat list is a smell that subgroups were missed. R-IDs stay continuous across groups (R1, R2 in the first group; R3, R4 in the second; never restart at R1 per group). A requirement, key decision, or success criterion commits only what the user asked for or chose, what those need in order to work, or what passes Interaction Rule 9's test. Something you would add beyond that, such as an audit trail, an operator switch, an alert, or another safeguard nobody raised, goes in Scope Boundaries as deferred or in Outstanding Questions, not into a committed section.
Include when material
The agent decides per brainstorm whether each section carries information that isn't covered elsewhere. Filling a section with placeholder prose is worse than omitting it.
- Problem Frame — include when motivation isn't obvious from Summary alone (the why needs paragraphs, not a sentence). Backward-looking / situational. Does NOT restate the proposal; the remedy lives in Summary.
- Key Decisions — include when the brainstorm produced opinionated framing choices (defaults, scope narrowings, foundational technical picks) that constrain Requirements / Flows / Scope below. Sits high in the rendered doc so readers encounter the framing choices before descending into detail. Each entry is a provenance index entry, not a second statement of the rule: the decision in bold, at most one line of rationale, and — when the decision constrains specific requirements — exact
Governs R5, R7links naming them. The full normative rule text lives on the governed Rs; an entry that would write the rule out again cites them instead. A pure framing decision with no governed R carries its rationale and no links. An entry recording a decision settled in the invoking conversation may carry the inline annotation(session-settled: <class> — chosen over <alternative>: <reason>), with exactly two classes —user-directed(the user chose against or between presented options) anduser-approved(the agent proposed with the tradeoff surfaced; the user assented). An agent never labels its own unexamined proposal. Preserve the label on the Product Contract Key Decision and its exactGoverns R…links.ce-planmay inherit the label into a KTD only when the KTD makes a distinct how-level choice and cites the governed R-IDs; it must not create a KTD that merely mirrors the product decision.
- How This Work Fits Together — required when the coherent-work gate split a broader request; otherwise include when this plan is one part of a larger body of separately planned work and the relationship materially orients a cold reader. Give this section the semantic role
work-relationships, which remains stable even if its visible heading is renamed: in Markdown, place<!-- ce-section: work-relationships -->immediately before the heading; in HTML, putdata-ce-section="work-relationships"on the wrapping<section>. The role identifies meaning, not wording, and is the downstream discovery contract. Lead with the one area this plan covers and state that the broader breakdown is the current understanding, not a committed roadmap. Then use a shallow indented bullet list for later areas, with explicit relationship phrases such asDepends on,Enables,Shares,Can proceed independently of, andStill to decide; indentation groups the prose but never carries the relationship by itself. Future areas are contextual candidates, never Requirements or implied Implementation Units. A later plan may revise, split, merge, or discard them and cite the earlier plan with a repo-relative path; do not create or synchronize a separate master map. Keep Scope Boundaries as the authority for what this plan excludes rather than duplicating the full relationship list there. Use no diagram by default. Add one only when non-linear cross-links, fan-in, or fan-out would make the nested list misleading, and keep the bullet text complete without it.
- Actors — include when the proposed thing has multi-party behavior (multiple humans, agents, or systems meaningfully involved). Skip for non-behavioral brainstorms (naming briefs, data-shape briefs, pure research, decision frameworks).
- Key Flows — include when the proposed thing has multi-step behavior. Expected by default for behavioral brainstorms unless the proposed thing is genuinely non-flow-shaped (pure API surface, policy, artifact output) and Actors / Requirements / Scope Boundaries / Acceptance Examples together prevent downstream invention of paths. When omitting from a behavioral brainstorm, note the reason in the doc.
- Visualizations — a brainstorm gets a visual when a concept has a structure worth showing, and that decision turns on whether the structure exists, not on whether your own prose reads clearly. Calling your prose "clear enough" is the trap that quietly under-produces the visuals a reader actually uses — decide on the shape, not the wording. Shapes that warrant one: a data-shape transformation (before/after schema or field mapping), a source-of-truth fan-out (one authority feeding many derived surfaces), state-or-lifecycle logic, a multi-step flow, an entity/relationship structure, a decision boundary, a quantitative comparison — and, for any requirement that changes a UI, screen layout, component placement, or screen flow, a wireframe. This applies to backend and conceptual work, not only visual products: a data model, sync protocol, or agent workflow gets a conceptual diagram exactly as a UI requirement gets a wireframe. Match the visual to the shape — a UI/layout shape takes a wireframe in HTML (a mermaid layout diagram or prose in markdown; there is no inline-SVG wireframe in markdown), any other structure takes a conceptual diagram. A visual is cross-cutting, not a section of its own — it sits next to the Key Decision, Requirements group, or Flow it illustrates. A point with nothing structural to show gets no visual — a single-field add, a rename, or a one-line change has no structure, and a before/after of one changed line is decoration. One visual per concept the plan depends on, never decoration or ceremony.
Diagrams complement prose; they never replace it. A diagram is an on-ramp to the prose it illustrates, not a substitute. The IDed prose (Requirements, Key Decisions, Acceptance Examples) stays complete and standalone — a reader who ignores every diagram still gets the full content in text, and a downstream agent that reads the artifact as linear text is never left with a relationship that exists only in an SVG. Adding a before/after diagram is not license to thin the requirement or decision prose it depicts.
- Acceptance Examples — include when any requirement has a state-dependent or conditional shape ("When X, Y") where prose alone leaves ambiguity about edge cases. Always include AEs covering behavioral-conditional requirements — that's where the ambiguity bites hardest. Skip when all requirements are unconditional and unambiguous.
- Success Criteria — include when there are quality / metric / handoff signals that Requirements don't already carry: quantitative metrics ("p95 latency under 200ms"), qualitative criteria ("the agent's output reads as one voice"), process / handoff quality ("ce-doc-review can act on this without follow-ups"). Skip when Requirements ARE the success criteria (every R is "done when the R is true").
- Scope Boundaries — include when scope is contested or there are tempting non-goals worth naming explicitly. When the brainstorm is about positioning a product against adjacent ones the team could have built but is rejecting, split into "Deferred for later" (eventually but not v1) and "Outside this product's identity" (positioning decision). Otherwise, a single list is fine.
- Dependencies / Assumptions — include when material upstream dependencies exist or when assumptions the plan depends on need to be stated.
- Outstanding Questions — include when there are unresolved items. Distinguish "Resolve Before Planning" (blocks planning) from "Deferred to Planning" (answered during planning or codebase exploration).
- Sources / Research — include research that orients the planner or justifies framing choices. The test: "if I were the planner reading this cold, would this breadcrumb help me make better choices?" Yes → include (code locations, external docs, RFCs, constraints, prior plans — the category is inclusive, not enumerated). Process exhaust (reading the user's prompt, glancing at obvious files) → omit. A constraint adopted from a Compound Pack file is cited inline as
(pack: <id>, <path within the pack>)after the requirement or decision it shaped. The path is relative to the pack's own directory, so it is stable for path- and git-sourced packs alike. Cite the pack text; do not restate it. That marker is reserved for pack files;<root>/solutions/learnings keep the ordinary path citation.
Prototype sources
When a kept prototype informed this artifact, record its absolute run-directory path in Sources and identify decisions.md and the selected screens or states relevant to the requirements. Label the citation machine-local and best effort while the original checkout or temporary directory exists. State in the citation that a missing prototype is not a blocker and the artifact's requirements govern any disagreement. Do not copy the prototype or capsule into the repository. An undone overlay has no surviving prototype to cite.
Agent agency
The catalog is a floor, not a ceiling. When the brainstorm's content doesn't fit any catalog section, introduce a new one — don't force the content into a section it doesn't belong in. Content drives section choices, not vice versa.
The agent also picks per artifact:
- Whether Acceptance Examples render as a separate section or embed in each requirement
- How much depth each present section gets
(Requirements grouping is covered above in the Hard Floor item — group by concern by default, rendering a flat list only when all requirements are about the same thing, with continuous R-IDs across groups.)
Raw lines 353 to 369Brainstorm metadata fields
Every requirements-only unified plan carries a small set of stable metadata fields that downstream tooling depends on. The contract is format-independent: in markdown these fields appear as YAML frontmatter at the top of the file; in HTML they appear as visible text placed as references/html-rendering.md describes. Field names and semantics are the same across both formats so consumers can locate them without knowing which format produced the artifact.
Required
- **
title** — the artifact's descriptive name with a- Plansuffix (e.g.,Highlighter Tool - Plan), matching the H1 (markdown) or document<h1>(HTML). It is a unified plan at every readiness state, so the title stays stable whence-planenriches it. Do not put a conventional-commit prefix (feat:/fix:) in the title — thetypefield carries that. - **
type** — conventional-commit-prefix-aligned classification (feat,fix,refactor,docs, etc.). - **
date** — creation date in ISO 8601 (YYYY-MM-DD), ASCII digits only. Matches the calendar date in the filename (<root>/plans/YYYY-MM-DD-HHMM-<type>-<topic>-plan.<md|html>), which adds the local wall-clock time at write. - **
topic** — kebab-case slug identifying the brainstorm subject (e.g.,surface-scope-earlier,demo-reel-local-save). Used in the filename and as the resume-detection key whence-brainstormscans for an existing artifact to continue. - **
artifact_contract** — alwaysce-unified-plan/v1for new outputs. - **
product_contract_source** — alwaysce-brainstorm.
No status field
Unified plan artifacts have no status field and no active → completed lifecycle or readiness flag. Readers assess the contents and unresolved questions. No CE artifact carries mutable progress state; whether work shipped is derived from git, not stored in the doc. Do not introduce one.
Field-name stability
Field names are stable across brainstorm revisions — never rename a field or repurpose its semantics. Agents composing new brainstorms MUST use these exact names; adding new fields is fine, but renaming topic to subject or date to created breaks filename construction and resume detection.
ID and content rules
Same shape as plan rules.
- Stable IDs. R-IDs (Requirements), A-IDs (if Actors is included), F-IDs (if Key Flows is included), AE-IDs (if Acceptance Examples is included). No other ID namespaces.
- Plain prefix.
R1.,A1.,F1.,AE1.as bullet prefixes. Do not bold; the prefix is visually distinctive on its own. - Bold leader labels inside Flows and Acceptance Examples (
**Trigger:**,**Covers R4, R8.**) provide structure without deeper heading levels. - Repository file references are repo-relative. Kept local prototype citations follow the Prototype sources contract above.
- No process exhaust. No "captured at Phase X" notes, no
## Next Stepspointing to ce-plan, no italic provenance lines. Engineering process metadata belongs in commit messages and tool output, not the artifact. - No implementation details by default. Libraries, schemas, endpoints, file layouts, code structure stay out unless the brainstorm itself is inherently about a technical or architectural change and those details are the subject of the decision.
Discipline: Summary vs Problem Frame
When both sections are present, they earn separate sections only by holding to different purposes:
| Section | Question it answers | Time direction | Length |
|---|---|---|---|
## Summary | What is this doc proposing? | Forward-looking | 1-3 lines |
## Problem Frame | Why does this proposal exist? | Backward-looking / situational | Paragraphs |
- Summary doesn't need problem context. A reader scanning Summary gets the proposal at a glance.
- Problem Frame doesn't restate the proposal. It establishes the situation, the specific moment of pain, and the cost shape — then stops. The remedy lives in Summary; restating it in Problem Frame is the duplication that makes the two sections feel redundant.
Rendering
The format-specific references describe how to render these sections in each output format:
- Markdown rendering:
references/markdown-rendering.md - HTML rendering:
references/html-rendering.md
This reference (brainstorm-sections.md) is about WHAT the brainstorm contains; rendering references are about HOW each format presents it. The brainstorm is written in one format — markdown OR HTML, never both — based on the resolved output mode. The section catalog is the same regardless of format.