Skill Tracer
Skills › Knowledge Work Plugins › close-management

close-management

skill · 221 lines · Apache-2.0 · finance/skills/close-management/SKILL.md

The facts

Its description

Manage the month-end close process with task sequencing, dependencies, and status tracking. Use when planning the close calendar, tracking close progress, identifying blockers, or sequencing close activities by day.

The description the agent reads to decide when to use it.

From its settingsline 3

When it starts

This skill is marked `user-invocable: false`, so no phrase from a person directly launches it; the agent picks it up on its own when the conversation turns to running or tracking a month-end close — building the close calendar, sequencing close tasks by day, or chasing blockers and status. Its description is the only thing the agent sees first, and it points at close planning, progress tracking, blocker identification, and day-by-day sequencing.

Things a person might say (the model's guesses)

  • “Help me lay out our month-end close calendar for next month.”
  • “We're on day 3 of close and the AP reconciliation is blocked — what should we do?”
  • “Can you build a close checklist with owners, deadlines, and status?”

A model's summary of when it is used.

A model's reading

Who can start it

Only the agent

Only the agent starts it. It's hidden from your commands.

From its settingsline 4

Licence

Apache-2.0, from finance/LICENSE

The terms its author shares it under, which let it be shown here.

From the repositorylicence text

The text

Open on GitHub
1---
2name: close-management
3description: Manage the month-end close process with task sequencing, dependencies, and status tracking. Use when planning the close calendar, tracking close progress, identifying blockers, or sequencing close activities by day.
4user-invocable: false
5---
6
7# Close Management
8
9**Important**: This skill assists with close management workflows but does not provide financial advice. All close activities should be reviewed by qualified financial professionals.
11Month-end close checklist, task sequencing and dependencies, status tracking, and common close activities organized by day.

Close Management

Important: This skill assists with close management workflows but does not provide financial advice. All close activities should be reviewed by qualified financial professionals.

Month-end close checklist, task sequencing and dependencies, status tracking, and common close activities organized by day.

Raw lines 1 to 12
13## Month-End Close Checklist

Month-End Close Checklist

Raw lines 13 to 14
15### Pre-Close (Last 2-3 Business Days of the Month)
17- [ ] Send close calendar and deadline reminders to all contributors
18- [ ] Confirm cut-off procedures with AP, AR, payroll, and treasury
19- [ ] Verify all sub-systems are processing normally (ERP, payroll, banking)
20- [ ] Complete preliminary bank reconciliation (all but last-day activity)
21- [ ] Review open purchase orders for potential accrual needs
22- [ ] Confirm payroll processing schedule aligns with close timeline
23- [ ] Collect information for any known unusual transactions

Pre-Close (Last 2-3 Business Days of the Month)

  • [ ] Send close calendar and deadline reminders to all contributors
  • [ ] Confirm cut-off procedures with AP, AR, payroll, and treasury
  • [ ] Verify all sub-systems are processing normally (ERP, payroll, banking)
  • [ ] Complete preliminary bank reconciliation (all but last-day activity)
  • [ ] Review open purchase orders for potential accrual needs
  • [ ] Confirm payroll processing schedule aligns with close timeline
  • [ ] Collect information for any known unusual transactions
Raw lines 15 to 24
25### Close Day 1 (T+1: First Business Day After Month-End)
27- [ ] Confirm all sub-ledger modules have completed period-end processing
28- [ ] Run AP accruals for goods/services received but not invoiced
29- [ ] Post payroll entries and payroll accrual (if pay period straddles month-end)
30- [ ] Record cash receipts and disbursements through month-end
31- [ ] Post intercompany transactions and confirm with counterparties
32- [ ] Complete bank reconciliation with final bank statement
33- [ ] Run fixed asset depreciation
34- [ ] Post prepaid expense amortization

Close Day 1 (T+1: First Business Day After Month-End)

  • [ ] Confirm all sub-ledger modules have completed period-end processing
  • [ ] Run AP accruals for goods/services received but not invoiced
  • [ ] Post payroll entries and payroll accrual (if pay period straddles month-end)
  • [ ] Record cash receipts and disbursements through month-end
  • [ ] Post intercompany transactions and confirm with counterparties
  • [ ] Complete bank reconciliation with final bank statement
  • [ ] Run fixed asset depreciation
  • [ ] Post prepaid expense amortization
Raw lines 25 to 35
36### Close Day 2 (T+2)
38- [ ] Complete revenue recognition entries and deferred revenue adjustments
39- [ ] Post all remaining accrual journal entries
40- [ ] Complete AR subledger reconciliation
41- [ ] Complete AP subledger reconciliation
42- [ ] Record inventory adjustments (if applicable)
43- [ ] Post FX revaluation entries for foreign currency balances
44- [ ] Begin balance sheet account reconciliations

Close Day 2 (T+2)

  • [ ] Complete revenue recognition entries and deferred revenue adjustments
  • [ ] Post all remaining accrual journal entries
  • [ ] Complete AR subledger reconciliation
  • [ ] Complete AP subledger reconciliation
  • [ ] Record inventory adjustments (if applicable)
  • [ ] Post FX revaluation entries for foreign currency balances
  • [ ] Begin balance sheet account reconciliations
Raw lines 36 to 45
46### Close Day 3 (T+3)
48- [ ] Complete all balance sheet reconciliations
49- [ ] Post any adjusting journal entries identified during reconciliation
50- [ ] Complete intercompany reconciliation and elimination entries
51- [ ] Run preliminary trial balance and income statement
52- [ ] Perform preliminary flux analysis on income statement
53- [ ] Investigate and resolve material variances

Close Day 3 (T+3)

  • [ ] Complete all balance sheet reconciliations
  • [ ] Post any adjusting journal entries identified during reconciliation
  • [ ] Complete intercompany reconciliation and elimination entries
  • [ ] Run preliminary trial balance and income statement
  • [ ] Perform preliminary flux analysis on income statement
  • [ ] Investigate and resolve material variances
Raw lines 46 to 54
55### Close Day 4 (T+4)
57- [ ] Post tax provision entries (income tax, sales tax, property tax)
58- [ ] Complete equity roll-forward (stock compensation, treasury stock)
59- [ ] Finalize all journal entries — soft close
60- [ ] Generate draft financial statements (P&L, BS, CF)
61- [ ] Perform detailed flux analysis and prepare variance explanations
62- [ ] Management review of financial statements and key metrics

Close Day 4 (T+4)

  • [ ] Post tax provision entries (income tax, sales tax, property tax)
  • [ ] Complete equity roll-forward (stock compensation, treasury stock)
  • [ ] Finalize all journal entries — soft close
  • [ ] Generate draft financial statements (P&L, BS, CF)
  • [ ] Perform detailed flux analysis and prepare variance explanations
  • [ ] Management review of financial statements and key metrics
Raw lines 55 to 63
64### Close Day 5 (T+5)
66- [ ] Post any final adjustments from management review
67- [ ] Finalize financial statements — hard close
68- [ ] Lock the period in the ERP/GL system
69- [ ] Distribute financial reporting package to stakeholders
70- [ ] Update forecasts/projections based on actual results
71- [ ] Conduct close retrospective — identify process improvements

Close Day 5 (T+5)

  • [ ] Post any final adjustments from management review
  • [ ] Finalize financial statements — hard close
  • [ ] Lock the period in the ERP/GL system
  • [ ] Distribute financial reporting package to stakeholders
  • [ ] Update forecasts/projections based on actual results
  • [ ] Conduct close retrospective — identify process improvements
Raw lines 64 to 72
73## Task Sequencing and Dependencies

Task Sequencing and Dependencies

Raw lines 73 to 74
75### Dependency Map
77Tasks are organized by what must complete before the next task can begin:
79```
80LEVEL 1 (No dependencies — can start immediately at T+1):
81├── Cash receipts/disbursements recording
82├── Bank statement retrieval
83├── Payroll processing/accrual
84├── Fixed asset depreciation run
85├── Prepaid amortization
86├── AP accrual preparation
87└── Intercompany transaction posting
89LEVEL 2 (Depends on Level 1 completion):
90├── Bank reconciliation (needs: cash entries + bank statement)
91├── Revenue recognition (needs: billing/delivery data finalized)
92├── AR subledger reconciliation (needs: all revenue/cash entries)
93├── AP subledger reconciliation (needs: all AP entries/accruals)
94├── FX revaluation (needs: all foreign currency entries posted)
95└── Remaining accrual JEs (needs: review of all source data)
97LEVEL 3 (Depends on Level 2 completion):
98├── All balance sheet reconciliations (needs: all JEs posted)
99├── Intercompany reconciliation (needs: both sides posted)
100├── Adjusting entries from reconciliations
101└── Preliminary trial balance
103LEVEL 4 (Depends on Level 3 completion):
104├── Tax provision (needs: pre-tax income finalized)
105├── Equity roll-forward
106├── Consolidation and eliminations
107├── Draft financial statements
108└── Preliminary flux analysis
110LEVEL 5 (Depends on Level 4 completion):
111├── Management review
112├── Final adjustments
113├── Hard close / period lock
114├── Financial reporting package
115└── Forecast updates
116```

Dependency Map

Tasks are organized by what must complete before the next task can begin:

LEVEL 1 (No dependencies — can start immediately at T+1):
├── Cash receipts/disbursements recording
├── Bank statement retrieval
├── Payroll processing/accrual
├── Fixed asset depreciation run
├── Prepaid amortization
├── AP accrual preparation
└── Intercompany transaction posting

LEVEL 2 (Depends on Level 1 completion):
├── Bank reconciliation (needs: cash entries + bank statement)
├── Revenue recognition (needs: billing/delivery data finalized)
├── AR subledger reconciliation (needs: all revenue/cash entries)
├── AP subledger reconciliation (needs: all AP entries/accruals)
├── FX revaluation (needs: all foreign currency entries posted)
└── Remaining accrual JEs (needs: review of all source data)

LEVEL 3 (Depends on Level 2 completion):
├── All balance sheet reconciliations (needs: all JEs posted)
├── Intercompany reconciliation (needs: both sides posted)
├── Adjusting entries from reconciliations
└── Preliminary trial balance

LEVEL 4 (Depends on Level 3 completion):
├── Tax provision (needs: pre-tax income finalized)
├── Equity roll-forward
├── Consolidation and eliminations
├── Draft financial statements
└── Preliminary flux analysis

LEVEL 5 (Depends on Level 4 completion):
├── Management review
├── Final adjustments
├── Hard close / period lock
├── Financial reporting package
└── Forecast updates
Raw lines 75 to 117
118### Critical Path
120The critical path determines the minimum close duration. Typical critical path:
122```
123Cash/AP/AR entries → Subledger reconciliations → Balance sheet recs →
124 Tax provision → Draft financials → Management review → Hard close
125```
127To shorten the close:
128- Automate Level 1 entries (depreciation, prepaid amortization, standard accruals)
129- Pre-reconcile accounts during the month (continuous reconciliation)
130- Parallel-process independent reconciliations
131- Set clear deadlines with consequences for late submissions
132- Use standardized templates to reduce reconciliation prep time

Critical Path

The critical path determines the minimum close duration. Typical critical path:

Cash/AP/AR entries → Subledger reconciliations → Balance sheet recs →
  Tax provision → Draft financials → Management review → Hard close

To shorten the close:

  • Automate Level 1 entries (depreciation, prepaid amortization, standard accruals)
  • Pre-reconcile accounts during the month (continuous reconciliation)
  • Parallel-process independent reconciliations
  • Set clear deadlines with consequences for late submissions
  • Use standardized templates to reduce reconciliation prep time
Raw lines 118 to 133
134## Status Tracking and Reporting

Status Tracking and Reporting

Raw lines 134 to 135
136### Close Status Dashboard
138Track each close task with the following attributes:
140| Task | Owner | Deadline | Status | Blocker | Notes |
141|------|-------|----------|--------|---------|-------|
142| [Task name] | [Person/role] | [Day T+N] | Not Started / In Progress / Complete / Blocked | [If blocked, what's blocking] | [Any notes] |

Close Status Dashboard

Track each close task with the following attributes:

TaskOwnerDeadlineStatusBlockerNotes
[Task name][Person/role][Day T+N]Not Started / In Progress / Complete / Blocked[If blocked, what's blocking][Any notes]
Raw lines 136 to 143
144### Status Definitions
146- **Not Started:** Task has not yet begun (may be waiting on dependencies)
147- **In Progress:** Task is actively being worked on
148- **Complete:** Task is finished and has been reviewed/approved
149- **Blocked:** Task cannot proceed due to a dependency, missing data, or issue
150- **At Risk:** Task is in progress but may not meet its deadline

Status Definitions

  • Not Started: Task has not yet begun (may be waiting on dependencies)
  • In Progress: Task is actively being worked on
  • Complete: Task is finished and has been reviewed/approved
  • Blocked: Task cannot proceed due to a dependency, missing data, or issue
  • At Risk: Task is in progress but may not meet its deadline
Raw lines 144 to 151
152### Daily Close Status Meeting (Recommended)
154During the close period, hold a brief (15-minute) daily standup:
1561. **Review status board:** Walk through open tasks, flag any that are behind
1572. **Identify blockers:** Surface any issues preventing task completion
1583. **Reassign or escalate:** Adjust ownership or escalate blockers to resolve quickly
1594. **Update timeline:** If any tasks are at risk, assess impact on overall close timeline

Daily Close Status Meeting (Recommended)

During the close period, hold a brief (15-minute) daily standup:

  1. Review status board: Walk through open tasks, flag any that are behind
  2. Identify blockers: Surface any issues preventing task completion
  3. Reassign or escalate: Adjust ownership or escalate blockers to resolve quickly
  4. Update timeline: If any tasks are at risk, assess impact on overall close timeline
Raw lines 152 to 160
161### Close Metrics to Track Over Time
163| Metric | Definition | Target |
164|--------|-----------|--------|
165| Close duration | Business days from period end to hard close | Reduce over time |
166| # of adjusting entries after soft close | Entries posted during management review | Minimize |
167| # of late tasks | Tasks completed after their deadline | Zero |
168| # of reconciliation exceptions | Reconciling items requiring investigation | Reduce over time |
169| # of restatements / corrections | Errors found after close | Zero |

Close Metrics to Track Over Time

MetricDefinitionTarget
Close durationBusiness days from period end to hard closeReduce over time
# of adjusting entries after soft closeEntries posted during management reviewMinimize
# of late tasksTasks completed after their deadlineZero
# of reconciliation exceptionsReconciling items requiring investigationReduce over time
# of restatements / correctionsErrors found after closeZero
Raw lines 161 to 170
171## Common Close Activities by Day

Common Close Activities by Day

Raw lines 171 to 172
173### Typical 5-Day Close Calendar
175| Day | Key Activities | Responsible |
176|-----|---------------|-------------|
177| **T+1** | Cash entries, payroll, AP accruals, depreciation, prepaid amortization, intercompany posting | Staff accountants, payroll |
178| **T+2** | Revenue recognition, remaining accruals, subledger reconciliations (AR, AP, FA), FX revaluation | Revenue accountant, AP/AR, treasury |
179| **T+3** | Balance sheet reconciliations, intercompany reconciliation, eliminations, preliminary trial balance, preliminary flux | Accounting team, consolidation |
180| **T+4** | Tax provision, equity roll-forward, draft financial statements, detailed flux analysis, management review | Tax, controller, FP&A |
181| **T+5** | Final adjustments, hard close, period lock, reporting package distribution, forecast update, retrospective | Controller, FP&A, finance leadership |

Typical 5-Day Close Calendar

DayKey ActivitiesResponsible
T+1Cash entries, payroll, AP accruals, depreciation, prepaid amortization, intercompany postingStaff accountants, payroll
T+2Revenue recognition, remaining accruals, subledger reconciliations (AR, AP, FA), FX revaluationRevenue accountant, AP/AR, treasury
T+3Balance sheet reconciliations, intercompany reconciliation, eliminations, preliminary trial balance, preliminary fluxAccounting team, consolidation
T+4Tax provision, equity roll-forward, draft financial statements, detailed flux analysis, management reviewTax, controller, FP&A
T+5Final adjustments, hard close, period lock, reporting package distribution, forecast update, retrospectiveController, FP&A, finance leadership
Raw lines 173 to 182
183### Accelerated Close (3-Day Target)
185For organizations targeting a faster close:
187| Day | Key Activities |
188|-----|---------------|
189| **T+1** | All JEs posted (automated + manual), all subledger reconciliations, bank reconciliation, intercompany reconciliation, preliminary trial balance |
190| **T+2** | All balance sheet reconciliations, tax provision, consolidation, draft financial statements, flux analysis, management review |
191| **T+3** | Final adjustments, hard close, reporting package, forecast update |
193**Prerequisites for a 3-day close:**
194- Automated recurring journal entries (depreciation, amortization, standard accruals)
195- Continuous reconciliation during the month (not all at month-end)
196- Automated intercompany elimination
197- Pre-close activities completed before month-end (cut-off, accrual estimates)
198- Empowered team with clear ownership and minimal handoffs
199- Real-time or near-real-time sub-system integration

Accelerated Close (3-Day Target)

For organizations targeting a faster close:

DayKey Activities
T+1All JEs posted (automated + manual), all subledger reconciliations, bank reconciliation, intercompany reconciliation, preliminary trial balance
T+2All balance sheet reconciliations, tax provision, consolidation, draft financial statements, flux analysis, management review
T+3Final adjustments, hard close, reporting package, forecast update

Prerequisites for a 3-day close:

  • Automated recurring journal entries (depreciation, amortization, standard accruals)
  • Continuous reconciliation during the month (not all at month-end)
  • Automated intercompany elimination
  • Pre-close activities completed before month-end (cut-off, accrual estimates)
  • Empowered team with clear ownership and minimal handoffs
  • Real-time or near-real-time sub-system integration
Raw lines 183 to 200
201## Close Process Improvement

Close Process Improvement

Raw lines 201 to 202
203### Common Bottlenecks and Solutions
205| Bottleneck | Root Cause | Solution |
206|-----------|-----------|---------|
207| Late AP accruals | Waiting for department spend confirmation | Implement continuous accrual estimation; set cut-off deadlines |
208| Manual journal entries | Recurring entries prepared manually each month | Automate standard recurring entries in the ERP |
209| Slow reconciliations | Starting from scratch each month | Implement continuous/rolling reconciliation |
210| Intercompany delays | Waiting for counterparty confirmation | Automate intercompany matching; set stricter deadlines |
211| Management review changes | Large adjustments found during review | Improve preliminary review process; empower team to catch issues earlier |
212| Missing supporting documents | Scrambling for documentation at close | Maintain documentation throughout the month |

Common Bottlenecks and Solutions

BottleneckRoot CauseSolution
Late AP accrualsWaiting for department spend confirmationImplement continuous accrual estimation; set cut-off deadlines
Manual journal entriesRecurring entries prepared manually each monthAutomate standard recurring entries in the ERP
Slow reconciliationsStarting from scratch each monthImplement continuous/rolling reconciliation
Intercompany delaysWaiting for counterparty confirmationAutomate intercompany matching; set stricter deadlines
Management review changesLarge adjustments found during reviewImprove preliminary review process; empower team to catch issues earlier
Missing supporting documentsScrambling for documentation at closeMaintain documentation throughout the month
Raw lines 203 to 213
214### Close Retrospective Questions
216After each close, ask:
2171. What went well this close that we should continue?
2182. What took longer than expected and why?
2193. What blockers did we encounter and how can we prevent them?
2204. Were there any surprises in the financial results we should have caught earlier?
2215. What can we automate or streamline for next month?

Close Retrospective Questions

After each close, ask:

  1. What went well this close that we should continue?
  2. What took longer than expected and why?
  3. What blockers did we encounter and how can we prevent them?
  4. Were there any surprises in the financial results we should have caught earlier?
  5. What can we automate or streamline for next month?
Raw lines 214 to 221

From anthropics/knowledge-work-plugins at 2574e29, 2026-10-27. Skills read by DeepSeek V4.1 Flash on 2026-11-04. Summary and techniques by Claude Opus 5.5 on 2026-11-06.