roadmap-update

skill · 266 lines · Apache-2.0 · product-management/skills/roadmap-update/SKILL.md

The facts

Its description

Update, create, or reprioritize your product roadmap. Use when adding a new initiative and deciding what moves to make room, shifting priorities after new information comes in, moving timelines due to a dependency slip, or building a Now/Next/Later view from scratch.

The description the agent reads to decide when to use it.

From its settingsline 3

When it starts

The agent would pick this skill when someone wants to change, build, or re-order a product roadmap — adding an initiative and deciding what comes off, shifting priorities after new information, slipping dates because a dependency moved, or standing up a Now/Next/Later view from nothing. The description is operation-focused (update, create, reprioritize) rather than tied to a specific tool, so any roadmap-editing request fits.

Things a person might say (the model's guesses)

  • “Add the new SSO initiative to the roadmap — what has to come off to make room?”
  • “The billing migration slipped because the platform team is late, so push our timelines out.”
  • “Build me a Now/Next/Later roadmap for the next two quarters from scratch.”

A model's summary of when it is used.

A model's reading

What it takes when started

<update description>

What to type after its name when you start it.

From its settingsline 4

Stops for a person

1 line stops to ask a person

Lines that stop and wait for a person before going on. Found by matching words, so treat them as pointers.

Found by matching wordsline 29

Licence

Apache-2.0, from product-management/LICENSE

The terms its author shares it under, which let it be shown here.

From the repositorylicence text

The text

Open on GitHub

Most marks come from matching words in the file, so treat them as pointers.

1---
2name: roadmap-update
3description: Update, create, or reprioritize your product roadmap. Use when adding a new initiative and deciding what moves to make room, shifting priorities after new information comes in, moving timelines due to a dependency slip, or building a Now/Next/Later view from scratch.
4argument-hint: "<update description>"
5---
6
7# Roadmap Update
8
9> If you see unfamiliar placeholders or need to check which tools are connected, see [CONNECTORS.md](../../CONNECTORS.md).
11Update, create, or reprioritize a product roadmap.

Roadmap Update

If you see unfamiliar placeholders or need to check which tools are connected, see CONNECTORS.md.

Update, create, or reprioritize a product roadmap.

Raw lines 1 to 12
Boilerplate, lines 13 to 18. The same text appears in 24 other files here. Close
13## Usage
15```
16/roadmap-update $ARGUMENTS
17```
19## Workflow
21### 1. Understand Current State
23If **~~project tracker** is connected:
24- Pull current roadmap items with their statuses, assignees, and dates
25- Identify items that are overdue, at risk, or recently completed
26- Surface any items without clear owners or dates
28If no project management tool is connected:
29- Ask the user to describe their current roadmap or paste/upload it
30- Accept any format: list, table, spreadsheet, screenshot, or prose description

1. Understand Current State

If ~~project tracker is connected:

  • Pull current roadmap items with their statuses, assignees, and dates
  • Identify items that are overdue, at risk, or recently completed
  • Surface any items without clear owners or dates

If no project management tool is connected:

  • Ask the user to describe their current roadmap or paste/upload it
  • Accept any format: list, table, spreadsheet, screenshot, or prose description
Raw lines 21 to 31
Uses an outside tool ~~project :23
Involves a person Ask the user :29
32### 2. Determine the Operation
34Ask what the user wants to do:
36**Add item**: New feature, initiative, or work item to the roadmap
37- Gather: name, description, priority, estimated effort, target timeframe, owner, dependencies
38- Suggest where it fits based on current priorities and capacity
40**Update status**: Change status of existing items
41- Options: not started, in progress, at risk, blocked, completed, cut
42- For "at risk" or "blocked": ask for the blocker and mitigation plan
44**Reprioritize**: Change the order or priority of items
45- Ask what changed (new information, strategy shift, resource change, customer feedback)
46- Apply a prioritization framework if helpful — see **Prioritization Frameworks** below for RICE, MoSCoW, ICE, and value-vs-effort
47- Show before/after comparison
49**Move timeline**: Shift dates for items
50- Ask why (scope change, dependency slip, resource constraint)
51- Identify downstream impacts on dependent items
52- Flag items that move past hard deadlines
54**Create new roadmap**: Build a roadmap from scratch
55- Ask about timeframe (quarter, half, year)
56- Ask about format preference (Now/Next/Later, quarterly columns, OKR-aligned) — see **Roadmap Frameworks** below
57- Gather the list of initiatives to include

2. Determine the Operation

Ask what the user wants to do:

Add item: New feature, initiative, or work item to the roadmap

  • Gather: name, description, priority, estimated effort, target timeframe, owner, dependencies
  • Suggest where it fits based on current priorities and capacity

Update status: Change status of existing items

  • Options: not started, in progress, at risk, blocked, completed, cut
  • For "at risk" or "blocked": ask for the blocker and mitigation plan

Reprioritize: Change the order or priority of items

  • Ask what changed (new information, strategy shift, resource change, customer feedback)
  • Apply a prioritization framework if helpful — see Prioritization Frameworks below for RICE, MoSCoW, ICE, and value-vs-effort
  • Show before/after comparison

Move timeline: Shift dates for items

  • Ask why (scope change, dependency slip, resource constraint)
  • Identify downstream impacts on dependent items
  • Flag items that move past hard deadlines

Create new roadmap: Build a roadmap from scratch

  • Ask about timeframe (quarter, half, year)
  • Ask about format preference (Now/Next/Later, quarterly columns, OKR-aligned) — see Roadmap Frameworks below
  • Gather the list of initiatives to include
Raw lines 32 to 58
59### 3. Generate Roadmap Summary
61Produce a roadmap view with:
63#### Status Overview
64Quick summary: X items in progress, Y completed this period, Z at risk.
66#### Roadmap Items
67For each item, show:
68- Name and one-line description
69- Status indicator (on track / at risk / blocked / completed / not started)
70- Target timeframe or date
71- Owner
72- Key dependencies
74Group items by:
75- Timeframe (Now / Next / Later) or quarter, depending on format
76- Or by theme/goal if the user prefers
78#### Risks and Dependencies
79- Items that are blocked or at risk, with details
80- Cross-team dependencies and their status
81- Items approaching hard deadlines
83#### Changes This Update
84If this is an update to an existing roadmap, summarize what changed:
85- Items added, removed, or reprioritized
86- Timeline shifts
87- Status changes

3. Generate Roadmap Summary

Produce a roadmap view with:

Status Overview

Quick summary: X items in progress, Y completed this period, Z at risk.

Roadmap Items

For each item, show:

  • Name and one-line description
  • Status indicator (on track / at risk / blocked / completed / not started)
  • Target timeframe or date
  • Owner
  • Key dependencies

Group items by:

  • Timeframe (Now / Next / Later) or quarter, depending on format
  • Or by theme/goal if the user prefers

Risks and Dependencies

  • Items that are blocked or at risk, with details
  • Cross-team dependencies and their status
  • Items approaching hard deadlines

Changes This Update

If this is an update to an existing roadmap, summarize what changed:

  • Items added, removed, or reprioritized
  • Timeline shifts
  • Status changes
Raw lines 59 to 88
89### 4. Follow Up
91After generating the roadmap:
92- Offer to format for a specific audience (executive summary, engineering detail, customer-facing)
93- Offer to draft communication about roadmap changes
94- If project management tool is connected, offer to update ticket statuses

4. Follow Up

After generating the roadmap:

  • Offer to format for a specific audience (executive summary, engineering detail, customer-facing)
  • Offer to draft communication about roadmap changes
  • If project management tool is connected, offer to update ticket statuses
Raw lines 89 to 95
96## Roadmap Frameworks

Roadmap Frameworks

Raw lines 96 to 97
98### Now / Next / Later
99The simplest and often most effective roadmap format:
101- **Now** (current sprint/month): Committed work. High confidence in scope and timeline. These are the things the team is actively building.
102- **Next** (next 1-3 months): Planned work. Good confidence in what, less confidence in exactly when. Scoped and prioritized but not yet started.
103- **Later** (3-6+ months): Directional. These are strategic bets and opportunities we intend to pursue, but scope and timing are flexible.
105When to use: Most teams, most of the time. Especially good for communicating externally or to leadership because it avoids false precision on dates.

Now / Next / Later

The simplest and often most effective roadmap format:

  • Now (current sprint/month): Committed work. High confidence in scope and timeline. These are the things the team is actively building.
  • Next (next 1-3 months): Planned work. Good confidence in what, less confidence in exactly when. Scoped and prioritized but not yet started.
  • Later (3-6+ months): Directional. These are strategic bets and opportunities we intend to pursue, but scope and timing are flexible.

When to use: Most teams, most of the time. Especially good for communicating externally or to leadership because it avoids false precision on dates.

Raw lines 98 to 106
107### Quarterly Themes
108Organize the roadmap around 2-3 themes per quarter:
110- Each theme represents a strategic area of investment (e.g., "Enterprise readiness", "Activation improvements", "Platform extensibility")
111- Under each theme, list the specific initiatives planned
112- Themes should map to company or team OKRs
113- This format makes it easy to explain WHY you are building what you are building
115When to use: When you need to show strategic alignment. Good for planning meetings and executive communication.

Quarterly Themes

Organize the roadmap around 2-3 themes per quarter:

  • Each theme represents a strategic area of investment (e.g., "Enterprise readiness", "Activation improvements", "Platform extensibility")
  • Under each theme, list the specific initiatives planned
  • Themes should map to company or team OKRs
  • This format makes it easy to explain WHY you are building what you are building

When to use: When you need to show strategic alignment. Good for planning meetings and executive communication.

Raw lines 107 to 116
117### OKR-Aligned Roadmap
118Map roadmap items directly to Objectives and Key Results:
120- Start with the team's OKRs for the period
121- Under each Key Result, list the initiatives that will move that metric
122- Include the expected impact of each initiative on the Key Result
123- This creates clear accountability between what you build and what you measure
125When to use: Organizations that run on OKRs. Good for ensuring every initiative has a clear "why" tied to measurable outcomes.

OKR-Aligned Roadmap

Map roadmap items directly to Objectives and Key Results:

  • Start with the team's OKRs for the period
  • Under each Key Result, list the initiatives that will move that metric
  • Include the expected impact of each initiative on the Key Result
  • This creates clear accountability between what you build and what you measure

When to use: Organizations that run on OKRs. Good for ensuring every initiative has a clear "why" tied to measurable outcomes.

Raw lines 117 to 126
127### Timeline / Gantt View
128Calendar-based view with items on a timeline:
130- Shows start dates, end dates, and durations
131- Visualizes parallelism and sequencing
132- Good for identifying resource conflicts
133- Shows dependencies between items
135When to use: Execution planning with engineering. Identifying scheduling conflicts. NOT good for communicating externally (creates false precision expectations).

Timeline / Gantt View

Calendar-based view with items on a timeline:

  • Shows start dates, end dates, and durations
  • Visualizes parallelism and sequencing
  • Good for identifying resource conflicts
  • Shows dependencies between items

When to use: Execution planning with engineering. Identifying scheduling conflicts. NOT good for communicating externally (creates false precision expectations).

Raw lines 127 to 136
137## Prioritization Frameworks

Prioritization Frameworks

Raw lines 137 to 138
139### RICE Score
140Score each initiative on four dimensions, then calculate RICE = (Reach x Impact x Confidence) / Effort
142- **Reach**: How many users/customers will this affect in a given time period? Use concrete numbers (e.g., "500 users per quarter").
143- **Impact**: How much will this move the needle for each person reached? Score on a scale: 3 = massive, 2 = high, 1 = medium, 0.5 = low, 0.25 = minimal.
144- **Confidence**: How confident are we in the reach and impact estimates? 100% = high confidence (backed by data), 80% = medium (some evidence), 50% = low (gut feel).
145- **Effort**: How many person-months of work? Include engineering, design, and any other functions.
147When to use: When you need a quantitative, defensible prioritization. Good for comparing a large backlog of initiatives. Less good for strategic bets where impact is hard to estimate.

RICE Score

Score each initiative on four dimensions, then calculate RICE = (Reach x Impact x Confidence) / Effort

  • Reach: How many users/customers will this affect in a given time period? Use concrete numbers (e.g., "500 users per quarter").
  • Impact: How much will this move the needle for each person reached? Score on a scale: 3 = massive, 2 = high, 1 = medium, 0.5 = low, 0.25 = minimal.
  • Confidence: How confident are we in the reach and impact estimates? 100% = high confidence (backed by data), 80% = medium (some evidence), 50% = low (gut feel).
  • Effort: How many person-months of work? Include engineering, design, and any other functions.

When to use: When you need a quantitative, defensible prioritization. Good for comparing a large backlog of initiatives. Less good for strategic bets where impact is hard to estimate.

Raw lines 139 to 148
149### MoSCoW
150Categorize items into Must have, Should have, Could have, Won't have:
152- **Must have**: The roadmap is a failure without these. Non-negotiable commitments.
153- **Should have**: Important and expected, but delivery is viable without them.
154- **Could have**: Desirable but clearly lower priority. Include only if capacity allows.
155- **Won't have**: Explicitly out of scope for this period. Important to list for clarity.
157When to use: Scoping a release or quarter. Negotiating with stakeholders about what fits. Good for forcing prioritization conversations.

MoSCoW

Categorize items into Must have, Should have, Could have, Won't have:

  • Must have: The roadmap is a failure without these. Non-negotiable commitments.
  • Should have: Important and expected, but delivery is viable without them.
  • Could have: Desirable but clearly lower priority. Include only if capacity allows.
  • Won't have: Explicitly out of scope for this period. Important to list for clarity.

When to use: Scoping a release or quarter. Negotiating with stakeholders about what fits. Good for forcing prioritization conversations.

Raw lines 149 to 158
159### ICE Score
160Simpler than RICE. Score each item 1-10 on three dimensions:
162- **Impact**: How much will this move the target metric?
163- **Confidence**: How confident are we in the impact estimate?
164- **Ease**: How easy is this to implement? (Inverse of effort — higher = easier)
166ICE Score = Impact x Confidence x Ease
168When to use: Quick prioritization of a feature backlog. Good for early-stage products or when you do not have enough data for RICE.

ICE Score

Simpler than RICE. Score each item 1-10 on three dimensions:

  • Impact: How much will this move the target metric?
  • Confidence: How confident are we in the impact estimate?
  • Ease: How easy is this to implement? (Inverse of effort — higher = easier)

ICE Score = Impact x Confidence x Ease

When to use: Quick prioritization of a feature backlog. Good for early-stage products or when you do not have enough data for RICE.

Raw lines 159 to 169
170### Value vs Effort Matrix
171Plot initiatives on a 2x2 matrix:
173- **High value, Low effort** (Quick wins): Do these first.
174- **High value, High effort** (Big bets): Plan these carefully. Worth the investment but need proper scoping.
175- **Low value, Low effort** (Fill-ins): Do these when you have spare capacity.
176- **Low value, High effort** (Money pits): Do not do these. Remove from the backlog.
178When to use: Visual prioritization in team planning sessions. Good for building shared understanding of tradeoffs.

Value vs Effort Matrix

Plot initiatives on a 2x2 matrix:

  • High value, Low effort (Quick wins): Do these first.
  • High value, High effort (Big bets): Plan these carefully. Worth the investment but need proper scoping.
  • Low value, Low effort (Fill-ins): Do these when you have spare capacity.
  • Low value, High effort (Money pits): Do not do these. Remove from the backlog.

When to use: Visual prioritization in team planning sessions. Good for building shared understanding of tradeoffs.

Raw lines 170 to 179
180## Dependency Mapping

Dependency Mapping

Raw lines 180 to 181
182### Identifying Dependencies
183Look for dependencies across these categories:
185- **Technical dependencies**: Feature B requires infrastructure work from Feature A
186- **Team dependencies**: Feature requires work from another team (design, platform, data)
187- **External dependencies**: Waiting on a vendor, partner, or third-party integration
188- **Knowledge dependencies**: Need research or investigation results before starting
189- **Sequential dependencies**: Must ship Feature A before starting Feature B (shared code, user flow)

Identifying Dependencies

Look for dependencies across these categories:

  • Technical dependencies: Feature B requires infrastructure work from Feature A
  • Team dependencies: Feature requires work from another team (design, platform, data)
  • External dependencies: Waiting on a vendor, partner, or third-party integration
  • Knowledge dependencies: Need research or investigation results before starting
  • Sequential dependencies: Must ship Feature A before starting Feature B (shared code, user flow)
Raw lines 182 to 190
191### Managing Dependencies
192- List all dependencies explicitly in the roadmap
193- Assign an owner to each dependency (who is responsible for resolving it)
194- Set a "need by" date: when does the depending item need this resolved
195- Build buffer around dependencies — they are the highest-risk items on any roadmap
196- Flag dependencies that cross team boundaries early — these require coordination
197- Have a contingency plan: what do you do if the dependency slips?

Managing Dependencies

  • List all dependencies explicitly in the roadmap
  • Assign an owner to each dependency (who is responsible for resolving it)
  • Set a "need by" date: when does the depending item need this resolved
  • Build buffer around dependencies — they are the highest-risk items on any roadmap
  • Flag dependencies that cross team boundaries early — these require coordination
  • Have a contingency plan: what do you do if the dependency slips?
Raw lines 191 to 198
199### Reducing Dependencies
200- Can you build a simpler version that avoids the dependency?
201- Can you parallelize by using an interface contract or mock?
202- Can you sequence differently to move the dependency earlier?
203- Can you absorb the work into your team to remove the cross-team coordination?

Reducing Dependencies

  • Can you build a simpler version that avoids the dependency?
  • Can you parallelize by using an interface contract or mock?
  • Can you sequence differently to move the dependency earlier?
  • Can you absorb the work into your team to remove the cross-team coordination?
Raw lines 199 to 204
205## Capacity Planning

Capacity Planning

Raw lines 205 to 206
207### Estimating Capacity
208- Start with the number of engineers and the time period
209- Subtract known overhead: meetings, on-call rotations, interviews, holidays, PTO
210- A common rule of thumb: engineers spend 60-70% of time on planned feature work
211- Factor in team ramp time for new members

Estimating Capacity

  • Start with the number of engineers and the time period
  • Subtract known overhead: meetings, on-call rotations, interviews, holidays, PTO
  • A common rule of thumb: engineers spend 60-70% of time on planned feature work
  • Factor in team ramp time for new members
Raw lines 207 to 212
213### Allocating Capacity
214A healthy allocation for most product teams:
216- **70% planned features**: Roadmap items that advance strategic goals
217- **20% technical health**: Tech debt, reliability, performance, developer experience
218- **10% unplanned**: Buffer for urgent issues, quick wins, and requests from other teams
220Adjust ratios based on team context:
221- New product: more feature work, less tech debt
222- Mature product: more tech debt and reliability investment
223- Post-incident: more reliability, less features
224- Rapid growth: more scalability and performance

Allocating Capacity

A healthy allocation for most product teams:

  • 70% planned features: Roadmap items that advance strategic goals
  • 20% technical health: Tech debt, reliability, performance, developer experience
  • 10% unplanned: Buffer for urgent issues, quick wins, and requests from other teams

Adjust ratios based on team context:

  • New product: more feature work, less tech debt
  • Mature product: more tech debt and reliability investment
  • Post-incident: more reliability, less features
  • Rapid growth: more scalability and performance
Raw lines 213 to 225
226### Capacity vs Ambition
227- If roadmap commitments exceed capacity, something must give
228- Do not solve capacity problems by pretending people can do more — solve by cutting scope
229- When adding to the roadmap, always ask: "What comes off?"
230- Better to commit to fewer things and deliver reliably than to overcommit and disappoint

Capacity vs Ambition

  • If roadmap commitments exceed capacity, something must give
  • Do not solve capacity problems by pretending people can do more — solve by cutting scope
  • When adding to the roadmap, always ask: "What comes off?"
  • Better to commit to fewer things and deliver reliably than to overcommit and disappoint
Raw lines 226 to 231
232## Communicating Roadmap Changes

Communicating Roadmap Changes

Raw lines 232 to 233
234### When the Roadmap Changes
235Common triggers for roadmap changes:
236- New strategic priority from leadership
237- Customer feedback or research that changes priorities
238- Technical discovery that changes estimates
239- Dependency slip from another team
240- Resource change (team grows or shrinks, key person leaves)
241- Competitive move that requires response

When the Roadmap Changes

Common triggers for roadmap changes:

  • New strategic priority from leadership
  • Customer feedback or research that changes priorities
  • Technical discovery that changes estimates
  • Dependency slip from another team
  • Resource change (team grows or shrinks, key person leaves)
  • Competitive move that requires response
Raw lines 234 to 242
243### How to Communicate Changes
2441. **Acknowledge the change**: Be direct about what is changing and why
2452. **Explain the reason**: What new information drove this decision?
2463. **Show the tradeoff**: What was deprioritized to make room? Or what is slipping?
2474. **Show the new plan**: Updated roadmap with the changes reflected
2485. **Acknowledge impact**: Who is affected and how? Stakeholders who were expecting deprioritized items need to hear it directly.

How to Communicate Changes

  1. Acknowledge the change: Be direct about what is changing and why
  2. Explain the reason: What new information drove this decision?
  3. Show the tradeoff: What was deprioritized to make room? Or what is slipping?
  4. Show the new plan: Updated roadmap with the changes reflected
  5. Acknowledge impact: Who is affected and how? Stakeholders who were expecting deprioritized items need to hear it directly.
Raw lines 243 to 249
250### Avoiding Roadmap Whiplash
251- Do not change the roadmap for every piece of new information. Have a threshold for change.
252- Batch roadmap updates at natural cadences (monthly, quarterly) unless something is truly urgent.
253- Distinguish between "roadmap change" (strategic reprioritization) and "scope adjustment" (normal execution refinement).
254- Track how often the roadmap changes. Frequent changes may signal unclear strategy, not good responsiveness.

Avoiding Roadmap Whiplash

  • Do not change the roadmap for every piece of new information. Have a threshold for change.
  • Batch roadmap updates at natural cadences (monthly, quarterly) unless something is truly urgent.
  • Distinguish between "roadmap change" (strategic reprioritization) and "scope adjustment" (normal execution refinement).
  • Track how often the roadmap changes. Frequent changes may signal unclear strategy, not good responsiveness.
Raw lines 250 to 255
256## Output Format
258Use a clear, scannable format. Tables work well for roadmap items. Use text status labels: **Done**, **On Track**, **At Risk**, **Blocked**, **Not Started**.

Output Format

Use a clear, scannable format. Tables work well for roadmap items. Use text status labels: Done, On Track, At Risk, Blocked, Not Started.

Raw lines 256 to 259
260## Tips
262- A roadmap is a communication tool, not a project plan. Keep it at the right altitude — themes and outcomes, not tasks.
263- When reprioritizing, always ask what changed. Priority shifts should be driven by new information, not whim.
264- Flag capacity issues early. If the roadmap has more work than the team can handle, say so.
265- Dependencies are the biggest risk to roadmaps. Surface them explicitly.
266- If the user asks to add something, always ask what comes off or moves. Roadmaps are zero-sum against capacity.

Tips

  • A roadmap is a communication tool, not a project plan. Keep it at the right altitude — themes and outcomes, not tasks.
  • When reprioritizing, always ask what changed. Priority shifts should be driven by new information, not whim.
  • Flag capacity issues early. If the roadmap has more work than the team can handle, say so.
  • Dependencies are the biggest risk to roadmaps. Surface them explicitly.
  • If the user asks to add something, always ask what comes off or moves. Roadmaps are zero-sum against capacity.
Raw lines 260 to 266